Mitsubishi G-50A Installation Manual Page 61

  • Download
  • Add to my manuals
  • Print
  • Page
    / 110
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 60
57
8.4.5 In the case of measuring instrument pulse counting (direct reading) method
The measuring instrument pulse counting (direct reading) method is explained here.
For this method, charging is practiced only by the measuring instrument value collected by PLC.
Therefore, a measuring instrument is required to install for each charge block (tenant).
It is required to prepare PLC, the pulse counting software and the license registration of all G-50As
1
.
G-50A
PC for centralized control
(Integrated software)
PLC (pulse counting
software installed)
Integration and storing by counting the pulse from
measuring instrument
Calculation based on the data collected from PLC.
Storing for the past 3 months
File output
Output of apportioned result
(1) Standard charge
The standard charge is calculated by referring the contract rate of electricity, gas and city water and set
to TG-2000A for each measuring instrument.
(2) Unit price
For the unit price, the electricity may be set in 2 types (Electricity 1 and Electricity 2), and gas, city water
and calorific amount be in 1 type.
However, the time frame is set to all measuring instruments collectively.
(3) Charge
In this method, the charge may be calculated by multiplying the values of the measuring instruments
provided by the unit price and further adding the standard charge.
1
In the case of the measuring instrument pulse counting method, the operation information of air conditioners is not required, but the license
registration to G-50A is essential.
Figure 8-12 Mechanism of electric power pulse counting (direct reading) method
Page view 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 109 110

Comments to this Manuals

No comments