Mitsubishi PU-5TJSA Service Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
13
PC-2.5GJA1
PC-3GJA1
1240 (suspension bolt pitch)
140
150
320 80
17
70
6
1290
1214
210
180
81 76
1310
Air outlet
1228
680
254
Air intake
85
182
201
241
15
157
(3/8F liquid)
(5/8F gas)
(Drainage)
3
2
8
5
1
4
Electrical box
When electrical
box is pulled
down
[ FRONT VIEW ]
Celling
32
179
161
38
3879
42
6~7
525
1235
416
263
171
138
86
131
175 1
46
1
2
Electrical box
70
226
Gap to ceiling
1 Drainage pipe connection (26mm I.D.) 5 Refrigerant-pipe connection (liquid pipe side/flared connection)
2 Drainage pipe connection (for the left arrangement) 6 Knock out hole for upper drain pipe arrangement
3 Knock out hole for left drain-piping arrangement 7 Knock out hole for left drain pipe arrangement
4 Refrigerant-pipe connection (gas pipe side/flared connection) 8 Knock out hole for wiring arrangement
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. Please be sure when installing the drain-up machine (option parts).
refrigerant pipe will be only upper drain pipe arrangement.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 51 52

Comments to this Manuals

No comments