Mitsubishi P91DW User Manual Page 174

  • Download
  • Add to my manuals
  • Print
  • Page
    / 206
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 173
Chapter 5: Analysis Tools
5-73
Click on one of the bands whose value is known. In the dialog box displayed, enter the
value for the band, using either the keyboard or the numeric keypad in the dialog box.
When the entry is correct click on the OK button. The band number changes from white
to green, indicating that it is now a standard.
To enter the next value, click on another band. The dialog box will open again and will
show an estimated value (based on the object’s IDV value and on the standard value
already entered). Click OK to accept this value, or enter a value.
Entering the Value for a Standard Band
Once the second value has been entered, a curve is displayed. The points corresponding
to the standard bands are labeled in yellow. Points for the unknown objects on the image
are displayed on the standard curve based on their integrated density values. These are
labeled in white.
Standard Curve
Enter values for each band whose amount is known. As more standard points are added,
the calculated values of the unknown points may change.
Page view 173
1 2 ... 169 170 171 172 173 174 175 176 177 178 179 ... 205 206

Comments to this Manuals

No comments